Iteration 2c: G2 failed on speed; the project stops at G2
Iteration 2c was the last attempt the SRD allows under G2. It combined the two levers that each moved speed on validation, a speed-weighted loss and twice the model capacity, and judged G2 on a third fresh test split. Range and course are the best of the project. Speed is not within reach.
Verdict: G2 failed (agent review panel, round 2, no rejections). Under SRD §7 the project stops at G2: no-go.
- Range passes for both models: 13.5% [13.0, 13.9] instantaneous and 12.1% [11.7, 12.6] time-late at zig + 300 s on the σ = 1° slice, against 20%.
- Course passes for both: 7.36° [7.05, 7.70] and 6.12° [5.87, 6.41], against 10°.
- Speed fails for both: 1.47 kt [1.37, 1.52] and 1.53 kt [1.47, 1.61] at zig + 600 s, against 1 kt. Only 37% and 33% of scenarios are under 1 kt. Classical least squares reaches 0.61 kt on the same scenarios, at the Cramér–Rao bound.
Experiment of record:
experiments/20261016-i2d-g2/.
Curves and slices: iteration-2c results.