Skip to content

Check overrides

How quality checks advise, and how an analyst overrides them.

The model, its sequence diagram and its reference implementation are written in Phase 2. Version 0 gathers the requirements it must satisfy.

Requirements cited

SRD Requirement
PRN-08 The analyst owns the data: checks advise, the analyst may override, and overrides are recorded.
TL-16 Checks are tools bound to lifecycle events.
TL-17 A failed pre-save check warns and offers an override; saving anyway is recorded.
EXT-15 Content not imported is listed, never silently dropped.

Model

Phase 2.

Reference implementation

Phase 2.