Preview of pull request #37: Track operations, part B1: shear and stretch drag. Built from d1ddea5 on 2026-10-13 19:25 UTC. All previews
Skip to content

Check overrides

How quality checks advise, and how an analyst overrides them.

The model, its sequence diagram and its reference implementation are written in Phase 2. Version 0 gathers the requirements it must satisfy.

Requirements cited

SRD Requirement
PRN-08 The analyst owns the data: checks advise, the analyst may override, and overrides are recorded.
TL-16 Checks are tools bound to lifecycle events.
TL-17 A failed pre-save check warns and offers an override; saving anyway is recorded.
EXT-15 Content not imported is listed, never silently dropped.

Model

Phase 2.

Reference implementation

Phase 2.