The owner asked for progress to be visible before and after each task, not only at gate verdicts: a post that says where we are and where we are going when a task starts, and an illustrated deck with charts and track plots when it ends. This task sets that up and uses it on itself.

Where we are​

  • Gate 2 passed on the owner's manoeuvring scenarios, decided by the panel in round 2 (write-up). E, the learned model, beats the classical segmenter C by +0.025 of the one-leg-to-oracle gap; most of that is two rules a designer could write, and the learning beyond them is +0.007 [+0.001, +0.012].
  • Carried: E, with C″ (zig veto and fixed fade, nothing learned) as a standing control.
  • In progress: spec 008, uncertainty calibration (Gate 3). Test seed 320 is reserved for it.
  • Reporting so far: five gate write-ups, critical in substance, no figures. P0 had no post until today's backfill. Nothing describes direction between gates.

Where this task moves to​

  • Constitution 1.3.0: two posts per task (a Spec Kit feature or a gate run), a kickoff before implementation and a slides post before the PR. Owner-merged, as every constitution amendment.
  • Practice: AGENTS.md (Reporting), a process page, two post templates, a reveal.js deck template, and Spec Kit after-hooks so /speckit-specify writes the kickoff and /speckit-implement builds the slides.
  • Tooling: tma2-plot, a CLI that draws track plots (ownship blue, target red, each estimator's belief with 1-σ ellipses at named times) and error curves from any truth split and prediction files, with a provenance sidecar per figure.
  • Plan: plotter and tests; documents and templates; hooks; a P0 backfill post; this kickoff; the slides post for this task from a seeded demo split; PR.
  • Risks: decks for small changes become boilerplate (so the rule is scoped to specs and gates, with dated paragraphs for the rest); a second narrative per gate (so a gate's slides post is the write-up's illustrated companion and links to it); figures that cannot be remade (so each has a sidecar naming data digests, command and commit). We would stop if the site build or the repo grew beyond reason: figures are SVG and kept under about 200 KB.

How progress will be shown​

  • A track plot of a near engagement (demo split from seed 316, 12 scenarios, the MAN2 ranges; scenario 8, 7.7 km mean range) with batch least squares, the frozen MAN2 IMM and the oracle, marked 5 and 10 minutes after the zig.
  • A track plot of a far one (scenario 0, 28 km) where the IMM drifts.
  • Error curves against time for scenario 8.
  • All three made by tma2-plot at the PR's commit, with sidecars.