Skip to main content

2 posts tagged with "spec-023"

View All Tags

Slides: longer engagements, 6 to 48 hours

· 3 min read

Issue #42 asked what it would take to run our TMA on engagements of 6 to 48 hours. On four simulated engagements (seed 348), every standing system ran to the end, on windows of the size it was built for. The time-late control keeps its accuracy at every length. Running it on a whole long period does not work as written, and several parts of the code assume one ownship zig. An investigation, not a gate. Spec: specs/023-long-engagements/.

Kickoff: longer engagements, 6 to 48 hours

· 2 min read

Issue #42 asks what it takes to apply our TMA to engagements of 6, 12, 24 and 48 hours, and to show them on the viewer and time-late pages. This task is an investigation: it simulates one engagement of each length, runs the standing systems on them as they are, measures what that costs and how they do, and lists the implementation challenges. Spec: specs/023-long-engagements/.