Skip to main content

3 posts tagged with "spec-034"

View All Tags

Slides: the long-engagement track as a whole

· 2 min read

These slides are the illustrated companion to the write-up.

  • Stitched 2-hour ctl held up on the tended contact (registered to 12 h; 24 and 48 h one engagement each).
  • A carried start is not shown to help accuracy; it saves about 31% of the search where it runs.
  • A carried prior beats the same window alone where that window is blind to range (1.7–2.4 on 1-hour windows, 1.37 pooled on 2-hour windows at far range), and is not shown to beat keeping the bearings.
  • The owner adopted 2-hour ctl-prior, and the track closes here.

Spec: specs/034-long-synthesis/.

The long-engagement track as a whole: what seven studies established, and what they did not

· 12 min read

The long-engagement track asked whether the project's time-late system holds up over engagements of hours rather than one two-hour period, and whether carrying information from one window to the next makes it better. Seven studies, all in one simulator, give these answers:

  • Stitched 2-hour windows held up on the tended contact. The registered study covered 6 to 12 hours. Beyond that there is one engagement each at 24 and 48 hours, which are anecdotes.
  • A carried start is not shown to help accuracy. It saves about 31% of the search where it runs, and on its own it can cost accuracy.
  • A carried prior beats the same window alone where that window cannot see range.
    • On 1-hour windows it reads about 1.7 to 2.4.
    • On 2-hour windows it reads 1.54 on one seed and 1.37 pooled over three, all of it beyond 35 km.
    • Against a joint solve over the same past bearings it is not shown to be better.

The owner adopted 2-hour ctl-prior on 2026-11-21. This post closes the track unless the owner reopens it.

Spec: specs/034-long-synthesis/. Figures of record: experiments/20261121-long-synthesis/tables.md, generated from the test records by scripts/research/long_synthesis.py. Two reviewers checked this account against the records before it was published: experiments/20261121-long-synthesis/review.md.

Kickoff: the long-engagement track as a whole

· 2 min read

The long-engagement track has run through seven specs, from one engagement per length (spec 023) to the ownship holding legs longer than the window (spec 032). The owner has adopted 2-hour ctl-prior for the tended contact. This task writes the track up as a whole and closes it, as spec 019 did for the time-late track. Spec: specs/034-long-synthesis/.