Skip to main content

Kickoff: long engagements, carrying state, an incremental C, realism

· 2 min read

The owner asked for note 12's three recommendations to be implemented. They are: carry state between time-late windows, make C incremental, and make the long engagements more realistic. Spec: specs/024-long-carry-incremental-realism/.

Where we are​

  • Spec 023 ran the standing systems on 6 to 48 hour engagements, on windows. The time-late control held 1.6–2.7% median range error. Each real-time estimate re-ran C over its 2-hour window (27–37 s). The scenario was kind: the ownship steered on the truth, contact was never lost, and there was one target.

Where this task moves to​

  • Carry: each time-late window also starts its search from the previous window's declared history, in place of the start from nothing. It is compared with ctl on every window.
  • Incremental C: one confirmation per 2-hour block of estimates. Each estimate keeps the confirmed legs inside its 2-hour window. For blocks of one estimate this equals spec 023's run.
  • Realism, from a random stream of its own, so the first target is spec 023's:
    • the ownship steers on measured bearings and a range belief with 30% error;
    • contact gaps, and detection that fades beyond about 40 km;
    • a second target that the ownship does not manoeuvre for, with bearings mis-associated where the two contacts cross.
  • Risks: the second contact may be held too rarely to score, and one engagement per length gives anecdotes, not rates. A registered study is proposed afterwards, not run.

How progress will be shown​

The slides post will carry:

  • ctl and ctl-carry error and run time by window;
  • the incremental run's cost per estimate beside spec 023's;
  • each engagement's realistic tracks for both contacts;
  • error against time with the gaps marked.