Kickoff: time-late, the classical follow-on to Gate T
Gate T showed that a classical search over manoeuvre histories halves the track error of the standing classical system, and the review panel showed that this does not yet say where the gain comes from or how much is left to win. The owner has chosen classical work first: spec 014 trains nothing, runs the studies spec 013 owed, and turns Gate T's upper limit on headroom into a figure a decision on a learned model can rest on.
Where we are
- Gate T was decided by the panel in one round: five of six checks passed, the sixth failed as forecast. The search is at 0.039 in median period range error against 0.088 for C″ read as a track, and 0.022 for the reference.
- Carried: C and C″, frozen; the search as registered for Gate T. Nothing learned is carried into the time-late problem.
- Open: the search wins even where it names the wrong history, so the gain may be mostly the arc model, the prior and the whole period. The headroom of 1.46 is an upper limit. The search misses a quarter of manoeuvres and declares one in 7 of 12 periods that had none. Its probabilities mean nothing when the target does not manoeuvre as assumed. The owner's bearing-rate thinning idea has not been tested.
Where this task moves to
- SRD §5 (Gate T row and the rules it inherits) and §9 (owner, 2026-11-12); the spec is
specs/014-time-late-classical/. - Judged by: a stated share of the gain that refitting C″'s own manoeuvre times obtains; the share of wrong-history periods that are ambiguous in the bearings, and an attainable headroom judged against 10%; a false-manoeuvre rate on targets that hold course, to within 5 points; a thinning verdict by a rule written beforehand; and one recommendation on a learned whole-period model.
- Plan:
- Correct the three small errors in the prior under a new code digest and report the effect.
- Build the two controls (C″ refitted with the arc model and prior; the search with an uninformative prior) and the classing of wrong-history periods, on tuning seed 333.
- Run the thinning study and apply its adoption rule.
- Add the scored outputs and conditions Gate T lacked: manoeuvre counts and timing, splits, held-course periods, correlated and outlying errors, whole engagements, a smoothed filter.
- Register what is decided on fresh seeds, with forecasts; validation seed 334, then test seed 335; panel.
- If time allows: a prior-mismatch diagnostic and a broadened prior, reported only.
- Risks: the search takes minutes a period, so run time limits split sizes; the classing rule may leave most wrong periods "ambiguous" by construction and must be fixed on tuning data; a reference fitted from neutral starts may fail to converge on hard periods. We stop, as Gate T did, if the references are not sound on validation.
How progress will be shown
- A bar chart of track error: C″, C″ refitted, flat-prior search, search, reference, with paired per-period ratios (test seed 335).
- The classes of wrong-history periods and the attainable headroom beside Gate T's 1.46.
- False-manoeuvre rate on held-course periods for the search and C″, with intervals.
- Accuracy against run time for each thinning form, clean and with outliers (tuning seed 333).
- Track plots of one ambiguous period and one search failure, both candidate tracks drawn.
- All from committed experiment folders; scripts and commits named in the slides post.
Update, 13 November: the study is decided
The registered study ran on a fresh test seed and went to the panel: five approve with findings. The search's gain over the standing classical system held (a factor of 2.1), and about half of it is available without a search. On targets that never manoeuvre the search invents a manoeuvre three times in four. The panel found two defects in the registered code, one of which inflates that last figure, and narrowed most of the first readings; by the rule written beforehand no GPU budget goes to a learned whole-period model, though the evidence supports a narrower statement than the rule. The owner's thinning idea was not fairly tested. Write-up: time-late, the classical follow-on, with slides.