Skip to main content

Kickoff: the long-engagement track as a whole

ยท 2 min read

The long-engagement track has run through seven specs, from one engagement per length (spec 023) to the ownship holding legs longer than the window (spec 032). The owner has adopted 2-hour ctl-prior for the tended contact. This task writes the track up as a whole and closes it, as spec 019 did for the time-late track. Spec: specs/034-long-synthesis/.

Where we areโ€‹

  • Standing:
    • time-late ctl on 2-hour windows overlapping 30 minutes, stitched;
    • ctl-prior (the previous window's state and covariance as a prior, with a guard) adopted for the tended contact, up to 12 hours.
  • Decided along the way: spec 026 (carried start, untended contact, the IMM over hours), spec 028 (carried prior), spec 029 (blind 1-hour windows), spec 031 (against longer windows and a joint solve) and spec 032 (legs longer than the window).

Where this task moves toโ€‹

  • One account, built from the figures of record in the registered test records. Each figure is read by a script and quoted with its convention and its panel's wording.
  • Beside the gains: what stands with its faults, what was withdrawn, what was never tested, and what would justify reopening the track.
  • Nothing new is run: no new seed, no registered result.

How progress will be shownโ€‹

  • One chart of the decided ratios across the track, with their intervals.
  • Median errors of the standing systems against their comparators.
  • A short deck.