Gate 4 asked whether the carried Gate 2 estimator E can state an uncertainty an operator can act
on. The course statement is "within ±X with probability P, otherwise unknown", and range and speed
get 95% intervals. On validation the statement is honest on average. A learned head beats the
pre-registered classical control. But one per-bin reliability check missed its band, so by the
rule fixed beforehand the gate stopped at validation and the fresh test seed (320) was not
generated.
The review panel upheld the stop unanimously. It also found that the record's first reading was
too generous on three points:
- the miss was not a near-miss of one unlucky seed;
- the head's gain is mostly a classical function of E's own standard deviations;
- P is reliable on average but not on the rows just after a manoeuvre.